Accessing the Registry Web Portal¶
The web portal provides a visual interface to browse the projects and images you are entitled to.
Logging In¶
- Browse URL registry.wso2.com.
- Sign in using your standard WSO2 Account email address (the same email used for the Support Portal).

Note
If you are already logged in to your WSO2 account, that session will automatically authenticate you with the container registry. However, keep in mind that the user and system tokens generated from the WSO2 Support Portal are not valid for logging into the web portal.
Browsing Products and Projects¶
Upon logging in, the view is filtered based on your active WSO2 product subscriptions. You will see projects associated with your account.
-
Dashboard: The main page displays a list of Projects. Each Project corresponds to a WSO2 Product (e.g.,
wso2-apim,wso2-isetc.).
-
Select a Project: Click on a project name to enter it.
-
Repositories: Inside the project, you will see a list of Repositories.

-
Tags: Inside a Repository you can list down all the tags available.

Searching for an Image¶
If you are looking for a specific version or component under a Repository:
- Use the Search Bar at the top of the portal.
- Select the Tags as Type.
- Type the product name or tag (e.g.,
4.2.0-rocky). -
The results will show matching repositories available under your subscription.

Getting the Pull Command¶
To use an image, you need the exact "pull command" for your CLI.
- Click into a specific Repository.
- Locate the specific Tag (version) you wish to use (e.g.,
latestor4.2.0.15). -
Click the Artifact SHA value.

-
Select the Tag and click the Copy Icon next to the pull command.

e.g: docker pull registry.wso2.com/wso2-apim/am:latest